Frenchman's Reef Mine

From Ballarat and District Industrial Heritage Project
Jump to navigation Jump to search

History

Site

In the nine years between 1906 and 1916 from one vertical and six flatmakes, this company, chiefly from the flatmakes, crushed 30,848 tons of quartz for a yield of 10,580 ox., an average per ton of 6dwt, 21 gr., distributing out of the proceeds 6,400 pounds in dividends. ... Operations commenced on 13th December, 1906, by cutting down an old shaft started at 30 feet west of Frenchman's Reef, a vertical that outcrops at 40 feet west of a syncline 380 feet east of the Hepburn Springs anticline which, the survey indicates, is the Cornish fold from the lodes on the east-dipping beds flanking which the Cornish group of mines to the southward extracted such large stones of wealth over a period of some 30 years. Frenchman's reef cannot be traced throughout the stretch of country intervening between this mine and Cornish Hill, but by disconnected outcrops it is judged to be either the Crown or the Cornish lode[1]

See also

Notes

Flat makes are large bodies of quartz, more or less horizontal laterally, but with longitudinal pitch to the north to make off from the "verticals."[2]


References

  1. Whitelaw, H.S. and Baragwanath, W., The Daylesford Gold-field (with plans and sections), Bulletins of the Geological survey of Victoria No 42., Department of Mines, Victoria, 1923, p. 78.
  2. Bragwanath, B., Mahoney, D.J., Howitt, A.M.and Kenny, J.P.L., Guide for Prospectors in Victoria, Department of Mines, Victoria, 1931, p 44.


Further Reading

Whitelaw, H.S. and Baragwanath, W., The Daylesford Gold-Field Bulletin No. 42, Geological Survey of Victoria, 1923.

External Links


--C.K.Gervasoni 13:26, 25 July 2013 (EST)